{"projects":[{"objectid":1,"project_name":"Kahfah","type":"Solar","status":"Installed","capacity_gw":1.425,"region":"Hail","developer":"ACWA Power","expected_commissioning_year":2025,"tendering_year":2022,"lcoe_cent_kwh":1.769,"city":"Alkahfah","is_grid_connected":"Yes","kgis_id":27,"round_no":"PIF","source":"Ministry of Energy","longitude":43.016500000000065,"latitude":27.073000000000036},{"objectid":2,"project_name":"Haden 2","type":"Solar","status":"Tendered","capacity_gw":2,"region":"Makkah","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al Taif","is_grid_connected":"Yes","kgis_id":46,"round_no":"PIF","source":"Ministry of Energy","longitude":41.12570000000005,"latitude":21.726000000000056},{"objectid":3,"project_name":"Henakiyah 2","type":"Solar","status":"Under Development","capacity_gw":0.4,"region":"Madinah","developer":"EDF Renewables","expected_commissioning_year":2026,"tendering_year":2024,"lcoe_cent_kwh":1.51,"city":"Al Henakiyah","is_grid_connected":"Yes","kgis_id":9,"round_no":"Round 5","source":"Ministry of Energy","longitude":40.44020000000006,"latitude":24.912400000000048},{"objectid":4,"project_name":"Tabarjal","type":"Solar","status":"Installed","capacity_gw":0.4,"region":"Al-Jawf","developer":"Jinko Power","expected_commissioning_year":2026,"tendering_year":2022,"lcoe_cent_kwh":1.70795,"city":"Tubarjal","is_grid_connected":"Yes","kgis_id":23,"round_no":"Round 4","source":"Ministry of Energy","longitude":38.214500000000044,"latitude":30.510800000000074},{"objectid":5,"project_name":"Henakiyah 3","type":"Solar","status":"Tendered","capacity_gw":1.5,"region":"Madinah","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al Henakiyah","is_grid_connected":"Yes","kgis_id":45,"round_no":"PIF","source":"Ministry of Energy","longitude":40.44020000000006,"latitude":24.912400000000048},{"objectid":6,"project_name":"Afif 1","type":"Solar","status":"Under Development","capacity_gw":2,"region":"Riyadh","developer":"ACWA Power","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.27,"city":"Afif","is_grid_connected":"Yes","kgis_id":39,"round_no":"PIF","source":"Ministry of Energy","longitude":42.92657772300004,"latitude":23.914395159000037},{"objectid":7,"project_name":"Shuaibah 1","type":"Solar","status":"Installed","capacity_gw":0.6,"region":"Makkah","developer":"ACWA Power ","expected_commissioning_year":2024,"tendering_year":2019,"lcoe_cent_kwh":1.04,"city":"Alshuaibah","is_grid_connected":"Yes","kgis_id":26,"round_no":"PIF","source":"Ministry of Energy","longitude":39.55640000000005,"latitude":20.779700000000048},{"objectid":8,"project_name":"Rabigh 1","type":"Solar","status":"Installed","capacity_gw":0.3,"region":"Makkah","developer":"MARUBENI Corporation","expected_commissioning_year":2023,"tendering_year":2019,"lcoe_cent_kwh":1.7,"city":"Rabigh","is_grid_connected":"Yes","kgis_id":4,"round_no":"Round 2","source":"Ministry of Energy","longitude":39.00290000000007,"latitude":22.79550000000006},{"objectid":9,"project_name":"Tathleeth","type":"Solar","status":"Tendered","capacity_gw":0.6,"region":"Aseer","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Tathleeth","is_grid_connected":"Yes","kgis_id":52,"round_no":"Round 7","source":"Ministry of Energy","longitude":43.51330212500005,"latitude":19.527255101000037},{"objectid":10,"project_name":"Sakaka","type":"Solar","status":"Installed","capacity_gw":0.3,"region":"Al-Jawf","developer":"ACWA Power","expected_commissioning_year":2020,"tendering_year":2017,"lcoe_cent_kwh":2.3417,"city":"Sakaka ","is_grid_connected":"Yes","kgis_id":1,"round_no":"Round 1","source":"Ministry of Energy","longitude":40.053300000000036,"latitude":29.912900000000036},{"objectid":11,"project_name":"Khulis","type":"Solar","status":"Under Development","capacity_gw":2,"region":"Makkah","developer":"ACWA Power","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.36,"city":"Khulis","is_grid_connected":"Yes","kgis_id":37,"round_no":"PIF","source":"Ministry of Energy","longitude":39.366887965000046,"latitude":22.144403675000035},{"objectid":12,"project_name":"Mawqaq","type":"Solar","status":"Tendered","capacity_gw":0.6,"region":"Hail","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Mawqaq","is_grid_connected":"Yes","kgis_id":51,"round_no":"Round 7","source":"Ministry of Energy","longitude":41.17383808200003,"latitude":27.378997322000032},{"objectid":13,"project_name":"Ar Rass 2","type":"Solar","status":"Installed","capacity_gw":2,"region":"Al-Qassim","developer":"ACWA Power","expected_commissioning_year":2025,"tendering_year":2022,"lcoe_cent_kwh":1.69,"city":"Ar Rass","is_grid_connected":"Yes","kgis_id":28,"round_no":"PIF","source":"Ministry of Energy","longitude":43.489900000000034,"latitude":25.859700000000032},{"objectid":14,"project_name":"Jeddah","type":"Solar","status":"Installed","capacity_gw":0.3,"region":"Makkah","developer":"Masdar, EDF Renewables","expected_commissioning_year":2023,"tendering_year":2019,"lcoe_cent_kwh":1.62,"city":"Jeddah","is_grid_connected":"Yes","kgis_id":5,"round_no":"Round 2","source":"Ministry of Energy","longitude":39.18440000000004,"latitude":21.528800000000047},{"objectid":15,"project_name":"As Sdawi","type":"Solar","status":"Under Development","capacity_gw":2,"region":"Eastern Province","developer":"Masdar","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.2926,"city":"Al Sadawi","is_grid_connected":"Yes","kgis_id":19,"round_no":"Round 5","source":"Ministry of Energy","longitude":46.712600000000066,"latitude":28.109800000000064},{"objectid":16,"project_name":"Bilghah","type":"Wind","status":"Tendered","capacity_gw":1.3,"region":"Madinah","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al Henakiyah","is_grid_connected":"Yes","kgis_id":48,"round_no":"Round 7","source":"Ministry of Energy","longitude":41.611775703000035,"latitude":25.173517618000062},{"objectid":17,"project_name":"Wadi Aldawaser","type":"Solar","status":"Installed","capacity_gw":0.112,"region":"Riyadh","developer":"TotalEnergies","expected_commissioning_year":2025,"tendering_year":2020,"lcoe_cent_kwh":1.87,"city":"Wadi Aldawaser","is_grid_connected":"Yes","kgis_id":18,"round_no":"Round 3","source":"Ministry of Energy","longitude":44.74900000000008,"latitude":20.33170000000007},{"objectid":18,"project_name":"Muwayh 2","type":"Solar","status":"Tendered","capacity_gw":2,"region":"Makkah","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al Muwayh","is_grid_connected":"Yes","kgis_id":44,"round_no":"PIF","source":"Ministry of Energy","longitude":41.58740000000006,"latitude":22.744000000000028},{"objectid":19,"project_name":"Starah","type":"Wind","status":"Under Development","capacity_gw":2,"region":"Riyadh","developer":"ACWA Power","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":2.06,"city":"Starah","is_grid_connected":"Yes","kgis_id":38,"round_no":"PIF","source":"Ministry of Energy","longitude":46.319925769000065,"latitude":22.609112426000024},{"objectid":20,"project_name":"Saad 1","type":"Solar","status":"Installed","capacity_gw":0.3,"region":"Riyadh","developer":"Jinko Power","expected_commissioning_year":2024,"tendering_year":2020,"lcoe_cent_kwh":1.48,"city":"Sa'ad","is_grid_connected":"Yes","kgis_id":17,"round_no":"Round 3","source":"Ministry of Energy","longitude":47.55430000000007,"latitude":25.110400000000027},{"objectid":21,"project_name":"Waad Al Shammal","type":"Wind","status":"Installed","capacity_gw":0.5,"region":"Northern Borders","developer":"MARUBENI Corporation","expected_commissioning_year":2026,"tendering_year":2022,"lcoe_cent_kwh":1.70187,"city":"Waad Al Shamal","is_grid_connected":"Yes","kgis_id":24,"round_no":"Round 4","source":"Ministry of Energy","longitude":38.867500000000064,"latitude":31.64300000000003},{"objectid":22,"project_name":"Shaqra","type":"Wind","status":"Under Development","capacity_gw":1,"region":"Riyadh","developer":"ACWA Power","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.87,"city":"Shaqra","is_grid_connected":"Yes","kgis_id":35,"round_no":"PIF","source":"Ministry of Energy","longitude":45.25319953800005,"latitude":25.239755744000036},{"objectid":23,"project_name":"Muwayh","type":"Solar","status":"Installed","capacity_gw":2,"region":"Makkah","developer":"ACWA Power","expected_commissioning_year":2026,"tendering_year":2023,"lcoe_cent_kwh":1.60852,"city":"Al Muwayh","is_grid_connected":"Yes","kgis_id":32,"round_no":"PIF","source":"Ministry of Energy","longitude":41.58740000000006,"latitude":22.744000000000028},{"objectid":24,"project_name":"As Sdawi 2","type":"Solar","status":"Tendered","capacity_gw":3,"region":"Eastern Province","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al Sadawi","is_grid_connected":"Yes","kgis_id":42,"round_no":"PIF","source":"Ministry of Energy","longitude":46.712600000000066,"latitude":28.109800000000064},{"objectid":25,"project_name":"Henakiyah 1","type":"Solar","status":"Installed","capacity_gw":1.1,"region":"Madinah","developer":"Masdar, EDF Renewables","expected_commissioning_year":2025,"tendering_year":2022,"lcoe_cent_kwh":1.6842,"city":"Al Henakiyah","is_grid_connected":"Yes","kgis_id":22,"round_no":"Round 4","source":"Ministry of Energy","longitude":40.44020000000006,"latitude":24.912400000000048},{"objectid":26,"project_name":"Saad 2","type":"Solar","status":"Installed","capacity_gw":1.125,"region":"Riyadh","developer":"ACWA Power","expected_commissioning_year":2025,"tendering_year":2022,"lcoe_cent_kwh":1.794,"city":"Sa'ad","is_grid_connected":"Yes","kgis_id":29,"round_no":"PIF","source":"Ministry of Energy","longitude":47.55430000000007,"latitude":25.110400000000027},{"objectid":27,"project_name":"Al Darb","type":"Solar","status":"Under Development","capacity_gw":0.6,"region":"Jazan","developer":"Masdar","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.36,"city":"Ad Darb","is_grid_connected":"Yes","kgis_id":13,"round_no":"Round 6","source":"Ministry of Energy","longitude":42.268437464000044,"latitude":17.722824638000077},{"objectid":28,"project_name":"Sufun","type":"Solar","status":"Under Development","capacity_gw":0.4,"region":"Hail","developer":"TotalEnergies","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.5,"city":"As Sufun","is_grid_connected":"Yes","kgis_id":14,"round_no":"Round 6","source":"Ministry of Energy","longitude":41.51699042900003,"latitude":27.74852783600005},{"objectid":29,"project_name":"Dwadmi","type":"Wind","status":"Under Development","capacity_gw":1.5,"region":"Riyadh","developer":"KEPCO","expected_commissioning_year":2028,"tendering_year":2024,"lcoe_cent_kwh":1.33,"city":"Dawadmi","is_grid_connected":"Yes","kgis_id":15,"round_no":"Round 6","source":"Ministry of Energy","longitude":44.44261210900004,"latitude":24.523616787000037},{"objectid":30,"project_name":"Yunbu","type":"Wind","status":"Under Development","capacity_gw":0.7,"region":"Madinah","developer":"ACWA Power","expected_commissioning_year":2027,"tendering_year":2022,"lcoe_cent_kwh":1.72,"city":"Yunbu","is_grid_connected":"Yes","kgis_id":7,"round_no":"Round 4","source":"Ministry of Energy","longitude":38.17097446100007,"latitude":24.153703676000077},{"objectid":31,"project_name":"Rabigh 2","type":"Solar","status":"Under Development","capacity_gw":0.3,"region":"Makkah","developer":"TotalEnergies","expected_commissioning_year":2026,"tendering_year":2024,"lcoe_cent_kwh":1.78,"city":"Rabigh","is_grid_connected":"Yes","kgis_id":10,"round_no":"Round 5","source":"Ministry of Energy","longitude":38.995144089000064,"latitude":22.790769252000075},{"objectid":32,"project_name":"Haden","type":"Solar","status":"Installed","capacity_gw":2,"region":"Makkah","developer":"ACWA Power","expected_commissioning_year":2026,"tendering_year":2023,"lcoe_cent_kwh":1.59,"city":"Al Taif","is_grid_connected":"Yes","kgis_id":31,"round_no":"PIF","source":"Ministry of Energy","longitude":41.12570000000005,"latitude":21.726000000000056},{"objectid":33,"project_name":"Shegran ","type":"Wind","status":"Tendered","capacity_gw":0.9,"region":"Madinah","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al Henakiyah","is_grid_connected":"Yes","kgis_id":49,"round_no":"Round 7","source":"Ministry of Energy","longitude":40.70186967200004,"latitude":25.02063503000005},{"objectid":34,"project_name":"South Ola","type":"Solar","status":"Tendered","capacity_gw":0.5,"region":"Madinah","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al Ola","is_grid_connected":"Yes","kgis_id":50,"round_no":"Round 7","source":"Ministry of Energy","longitude":37.96585126800005,"latitude":26.56454724300005},{"objectid":35,"project_name":"Layla","type":"Solar","status":"Installed","capacity_gw":0.091,"region":"Riyadh","developer":"ACWA Power","expected_commissioning_year":2024,"tendering_year":2020,"lcoe_cent_kwh":2.98,"city":"Layla","is_grid_connected":"Yes","kgis_id":16,"round_no":"Round 3","source":"Ministry of Energy","longitude":46.70660000000004,"latitude":22.29210000000006},{"objectid":36,"project_name":"Sudair","type":"Solar","status":"Installed","capacity_gw":1.5,"region":"Riyadh","developer":"ACWA Power ","expected_commissioning_year":2023,"tendering_year":2019,"lcoe_cent_kwh":1.24,"city":"Sudair","is_grid_connected":"Yes","kgis_id":6,"round_no":"PIF","source":"Ministry of Energy","longitude":45.58023772900003,"latitude":25.77540936500003},{"objectid":37,"project_name":"Alghat","type":"Wind","status":"Installed","capacity_gw":0.6,"region":"Riyadh","developer":"MARUBENI Corporation","expected_commissioning_year":2026,"tendering_year":2022,"lcoe_cent_kwh":1.56558,"city":"AL Ghat","is_grid_connected":"Yes","kgis_id":21,"round_no":"Round 4","source":"Ministry of Energy","longitude":44.949100000000044,"latitude":26.025000000000034},{"objectid":38,"project_name":"Khushaybi","type":"Solar","status":"Installed","capacity_gw":1.5,"region":"Al-Qassim","developer":"ACWA Power","expected_commissioning_year":2026,"tendering_year":2023,"lcoe_cent_kwh":1.67289,"city":"Al-Khushaybi","is_grid_connected":"Yes","kgis_id":33,"round_no":"PIF","source":"Ministry of Energy","longitude":43.35420000000005,"latitude":25.573000000000036},{"objectid":39,"project_name":"Al Humaij","type":"Solar","status":"Under Development","capacity_gw":3,"region":"Madinah","developer":"ACWA Power","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.31,"city":"Al Humaij","is_grid_connected":"Yes","kgis_id":40,"round_no":"PIF","source":"Ministry of Energy","longitude":41.22877130200004,"latitude":25.037626242000044},{"objectid":40,"project_name":"Khushaybi 2","type":"Solar","status":"Tendered","capacity_gw":0.5,"region":"Al-Qassim","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al-Khushaybi","is_grid_connected":"Yes","kgis_id":43,"round_no":"PIF","source":"Ministry of Energy","longitude":43.35420000000005,"latitude":25.573000000000036},{"objectid":41,"project_name":"Ar Rass 1","type":"Solar","status":"Installed","capacity_gw":0.7,"region":"Al-Qassim","developer":"ACWA Power","expected_commissioning_year":2024,"tendering_year":2020,"lcoe_cent_kwh":1.5,"city":"Ar Rass","is_grid_connected":"Yes","kgis_id":3,"round_no":"Round 3","source":"Ministry of Energy","longitude":43.489900000000034,"latitude":25.859700000000032},{"objectid":42,"project_name":"Shuaibah 2","type":"Solar","status":"Installed","capacity_gw":2.06,"region":"Makkah","developer":"ACWA Power","expected_commissioning_year":2024,"tendering_year":2021,"lcoe_cent_kwh":1.79,"city":"Alshuaibah","is_grid_connected":"Yes","kgis_id":20,"round_no":"PIF","source":"Ministry of Energy","longitude":39.55640000000005,"latitude":20.779700000000048},{"objectid":43,"project_name":"Al Masa'a","type":"Solar","status":"Under Development","capacity_gw":1,"region":"Hail","developer":"EDF Renewables","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.36,"city":"Al Masa'a","is_grid_connected":"Yes","kgis_id":8,"round_no":"Round 5","source":"Ministry of Energy","longitude":40.515100000000075,"latitude":26.54690000000005},{"objectid":44,"project_name":"Bisha","type":"Solar","status":"Under Development","capacity_gw":3,"region":"Aseer","developer":"ACWA Power","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.29,"city":"Bisha","is_grid_connected":"Yes","kgis_id":36,"round_no":"PIF","source":"Ministry of Energy","longitude":42.59090033100006,"latitude":20.00691707900006},{"objectid":45,"project_name":"Afif 2","type":"Solar","status":"Under Development","capacity_gw":2,"region":"Riyadh","developer":"ACWA Power","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.26,"city":"Afif","is_grid_connected":"Yes","kgis_id":41,"round_no":"PIF","source":"Ministry of Energy","longitude":42.92657772300004,"latitude":23.914395159000037},{"objectid":46,"project_name":"Dumat Al-Jandal","type":"Wind","status":"Installed","capacity_gw":0.4,"region":"Al-Jawf","developer":"Masdar, EDF Renewables","expected_commissioning_year":2022,"tendering_year":2017,"lcoe_cent_kwh":2.13,"city":"Dumat al-Jandal","is_grid_connected":"Yes","kgis_id":2,"round_no":"Round 1","source":"Ministry of Energy","longitude":39.88070000000005,"latitude":29.809800000000052},{"objectid":47,"project_name":"Tabarjal 2","type":"Solar","status":"Tendered","capacity_gw":1.4,"region":"Al-Jawf","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Tubarjal","is_grid_connected":"Yes","kgis_id":47,"round_no":"Round 7","source":"Ministry of Energy","longitude":38.214500000000044,"latitude":30.510800000000074},{"objectid":48,"project_name":"Al Qirah","type":"Wind","status":"Tendered","capacity_gw":1.5,"region":"Aseer","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al Qirah","is_grid_connected":"Yes","kgis_id":54,"round_no":"PIF","source":"Ministry of Energy","longitude":44.06307916900005,"latitude":19.97869830600007},{"objectid":49,"project_name":"Samha","type":"Wind","status":"Tendered","capacity_gw":0.8,"region":"Al-Qassim","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Samha","is_grid_connected":"Yes","kgis_id":55,"round_no":"PIF","source":"Ministry of Energy","longitude":43.36518313800008,"latitude":25.493467372000055},{"objectid":50,"project_name":"Najran","type":"Solar","status":"Under Development","capacity_gw":1.4,"region":"Najran","developer":"Masdar","expected_commissioning_year":2028,"tendering_year":2024,"lcoe_cent_kwh":1.09,"city":"Najran","is_grid_connected":"Yes","kgis_id":11,"round_no":"Round 6","source":"Ministry of Energy","longitude":44.17260474400007,"latitude":17.52312701200003},{"objectid":51,"project_name":"Al-Leeth","type":"Solar","status":"Tendered","capacity_gw":3,"region":"Makkah","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Al-Leeth","is_grid_connected":"Yes","kgis_id":56,"round_no":"PIF","source":"Ministry of Energy","longitude":40.308487454000044,"latitude":20.115494298000044},{"objectid":52,"project_name":"Samtah","type":"Solar","status":"Under Development","capacity_gw":0.6,"region":"Jazan","developer":"EDF Renewables","expected_commissioning_year":2027,"tendering_year":2024,"lcoe_cent_kwh":1.48,"city":"Samtah","is_grid_connected":"Yes","kgis_id":12,"round_no":"Round 6","source":"Ministry of Energy","longitude":42.92345634700007,"latitude":16.603792979000048},{"objectid":53,"project_name":"Baeyda’a Nathel 1","type":"Wind","status":"Tendered","capacity_gw":1,"region":"Riyadh","developer":null,"expected_commissioning_year":2029,"tendering_year":2025,"lcoe_cent_kwh":null,"city":"Baeyda’a Nathel","is_grid_connected":"Yes","kgis_id":53,"round_no":"PIF","source":"Ministry of Energy","longitude":42.670937337000055,"latitude":23.888756926000042}]}